BAPTIST ROAD over JACKSON CREEK

0.2 MI E OF I-25 · County 041, Colorado · Built 2012 · 8 Lanes · 17,866 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
EPC0032-03.18
Year Built
2012
Length
9.8 m (32.2 ft)
Max Span
3.3 m
Width
50.3 m (165 ft)
Lanes
8
Daily Traffic
17,866
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.