UNION AVE over SOUTH PLATTE RIVER
0.3 MI W OF SANTA FE DR · County 005, Colorado · Built 1965 · 2 Lanes · 977 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.631858, -105.014689
This bridge is in worse condition than 75.8% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
US 85 ML over BIG DRY CREEK
Built 1939
WINDERMERE STREET over BIG DRY CREEK
Built 1997
US 85 over SH 88-BELLEVIEW AVE
Built 1998
SH 88 ML/Belleview over SOUTH PLATTE RIVER
Built 1988
RIO GRANDE ST over US 88 ML
Built 1980
OXFORD AVENUE over SOUTH PLATTE RIVER
Built 2000
SOUTH PRINCE ST over SOUTH PLATTE RIVER
Built 1985
PRINCE STREET over SLAUGHTERHOUSE GULCH
Built 1998
US 85ML over SLAUGHTER HOUSE GULCH
Built 1999
SH 88 ML over BIG DRY CREEK
Built 1963
Bridge Details
- Structure #
- ENGLWD-UNPR
- Year Built
- 1965
- Length
- 57.9 m (190 ft)
- Max Span
- 18.4 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 977
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $975,000
- Total Project Cost
- $1,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.