COUNTY ROAD 182 over W BIJOU CREEK TRIBUTARY

0.7 MILE EAST OF ROAD 101 · County 039, Colorado · Built 1965 · 1 Lanes · 35 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
ELBT-182-0.7-01
Year Built
1965
Reconstructed
2020
Length
12.3 m (40.4 ft)
Max Span
11.6 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
35
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.