E-470 ML over Local Drainage
42.45 MI FROM I25 · County 001, Colorado · Built 2002 · 4 Lanes · 36,702 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
39.966192, -104.919803
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 24 years old.
Nearby Bridges
E-470 SB over Holly Street
Built 2001
E-470 NB over Holly Street
Built 2001
QUEBEC STREET over E-470 ML
Built 2001
COLORADO BLVD over E-470 ML
Built 2001
E-470 ML over Local Drainage
Built 2003
EHLER PARKWAY over TODD CREEK TRIBUTARY
Built 2001
YOSEMITE STREET over TODD CREEK TRIBUTARY
Built 2001
FILLMORE STREET over LOCAL DRAINAGE
Built 2006
AKRON STREET over TODD CREEK TRIBUTARY
Built 2001
SH 7 ML over BIG DRY CREEK
Built 2002
Bridge Details
- Structure #
- E-470-42.45CBC
- Year Built
- 2002
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 119.5 m (392.1 ft)
- Lanes
- 4
- Daily Traffic
- 36,702
- Material
- Concrete
- Design
- Culvert
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.