NB E470 RAMP I76EB over BNSFRR Cameron Drive

35.34 MI FROM I25 · County 001, Colorado · Built 2002 · 1 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-35.34D
Year Built
2002
Length
158.5 m (520 ft)
Max Span
41.6 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
3,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.