E-470 NB over Buckley Road

34.63 MI FROM I25 · County 001, Colorado · Built 2002 · 2 Lanes · 21,707 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-34.63A
Year Built
2002
Length
44 m (144.4 ft)
Max Span
42.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
21,707
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.