E-470 WB over Happy Canyon Creek

3.26 MI FROM I 25 · County 035, Colorado · Built 1989 · 4 Lanes · 26,727 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-3.26B
Year Built
1989
Reconstructed
2004
Length
41.5 m (136.2 ft)
Max Span
40.9 m
Width
26.2 m (86 ft)
Lanes
4
Daily Traffic
26,727
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.