E-470 NB over Pena Boulevard

27.86 MI FROM I25 · County 031, Colorado · Built 1996 · 3 Lanes · 22,748 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-27.86A
Year Built
1996
Length
135.3 m (443.9 ft)
Max Span
45.8 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
22,748
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.