48th Avenue-Future over E-470

23.43 MI FROM I25 · County 001, Colorado · Built 1997 · 2 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
E-470-23.43C
Year Built
1997
Length
70.3 m (230.6 ft)
Max Span
33.8 m
Width
41.5 m (136.2 ft)
Lanes
2
Daily Traffic
29,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.