E-470 NB over Piney Creek

9.57 MI FROM I25 · County 005, Colorado · Built 1996 · 3 Lanes · 23,244 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E-470-09.57A
Year Built
1996
Reconstructed
2016
Length
47.7 m (156.5 ft)
Max Span
46.1 m
Width
22.7 m (74.5 ft)
Lanes
3
Daily Traffic
23,244
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.