PENA BLVD NBND RMP over AIRPORT BLVD SBND
PENA BLVD OVER I70 ML · County 001, Colorado · Built 1993 · 2 Lanes · 28,051 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.767417, -104.796669
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 33 years old.
Nearby Bridges
PENA BLVD NBND RMP over I 70 ML
Built 1993
PENA BLVD SBND RMP over RMP TO I70 WB ML
Built 1993
RAMP/PENA BLVD NBD over 40TH AVE ML R
Built 1993
AIRPORT BLVD over I-70
Built 1993
RAMP TO I 70 WBND over 40TH AVE ML R
Built 1993
RAMP TO I 70 EBND over RAMP TO PENA BLVD NBND R
Built 1993
RAMP TO I 70 WBND over RAMP TO CHAMBERS ROAD R
Built 1993
CHAMBERS ROAD over I 70 ML
Built 1987
CHAMBERS ROAD over MONTBELLO DITCH
Built 1980
SB PENA BLVD over GREEN VALLEY RANCH BLVD
Built 1993
Bridge Details
- Structure #
- E-17-RV
- Year Built
- 1993
- Length
- 54.6 m (179.1 ft)
- Max Span
- 24.5 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 28,051
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $274,000
- Total Project Cost
- $411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.