I 270 ML EBND over I 70 ML

DENVER · County 031, Colorado · Built 2019 · 2 Lanes · 73,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
E-17-AFS
Year Built
2019
Length
189.9 m (623 ft)
Max Span
64.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
73,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.