I70 ML WBND over DRIR

DENVER · County 031, Colorado · Built 2020 · 8 Lanes · 74,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
E-17-AFN
Year Built
2020
Length
42.7 m (140.1 ft)
Max Span
38.9 m
Width
41.6 m (136.5 ft)
Lanes
8
Daily Traffic
74,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.