I 76 ML over SOUTH PLATTE RIVER

1.9 MI SW OF JCT US 85 · County 001, Colorado · Built 2013 · 5 Lanes · 42,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
E-17-AET
Year Built
2013
Length
109.7 m (359.9 ft)
Max Span
36.6 m
Width
41.8 m (137.1 ft)
Lanes
5
Daily Traffic
42,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,928,000
Total Project Cost
$2,893,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.