84TH AVE over I 25 ML
THORNTON · County 001, Colorado · Built 2012 · 8 Lanes · 35,245 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.848886, -104.98605
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 14 years old.
Nearby Bridges
GRANT STREET over NIVER CREEK
Built 1993
I 25 ML over PEDESTRIAN UNDERPASS
Built 1955
WASHINGTON STREET over NIVER CREEK
Built 1960
88TH AVE over I 25 ML
Built 1972
DOWNING DRIVE over NIVER CREEK
Built 1965
EXPLORADOR CALLE over NIVER CREEK
Built 1970
THORNTON PKWY over NIVER CREEK
Built 1990
I 270 EBND ML over I25NB/I25HOV/WB I 270
Built 2009
THORNTON PKWY 94TH over I 25 ML
Built 1985
RAINBOW AVENUE over HOFFMAN DRAINAGE
Built 2017
Bridge Details
- Structure #
- E-17-ACR
- Year Built
- 2012
- Length
- 78.5 m (257.5 ft)
- Max Span
- 38.5 m
- Width
- 38.7 m (127 ft)
- Lanes
- 8
- Daily Traffic
- 35,245
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.