I 76 ML WBND over CLEAR CREEK

.3 MI EAST OF JCT SH 95 · County 001, Colorado · Built 1985 · 3 Lanes · 39,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
E-16-IR
Year Built
1985
Length
84.5 m (277.2 ft)
Max Span
30 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
39,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.