SH 391 ML over CLEAR CREEK

KIPLING 0.65 MI S OF I70 · County 059, Colorado · Built 1969 · 6 Lanes · 37,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
E-16-DP
Year Built
1969
Length
47.7 m (156.5 ft)
Max Span
22.9 m
Width
23.8 m (78.1 ft)
Lanes
6
Daily Traffic
37,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,090,000
Total Project Cost
$1,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.