TABOR STREET over I 70 ML

TABOR ST OVER I-70 ML · County 059, Colorado · Built 1967 · 2 Lanes · 4,951 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
E-16-CW
Year Built
1967
Length
69 m (226.4 ft)
Max Span
33.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
4,951
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$498,000
Total Project Cost
$758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.