TABOR STREET over I 70 ML
TABOR ST OVER I-70 ML · County 059, Colorado · Built 1967 · 2 Lanes · 4,951 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.782489, -105.130825
This bridge is in worse condition than 78.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 59 years old.
Nearby Bridges
I-70 ML over SH 72 ML/WARD ROAD
Built 2024
I 70 ML EBND over WEST 44TH AVE
Built 1968
I 70 ML WBND over WEST 44TH AVE
Built 1968
RAMP TO I 70 EBND over I 70 ML R
Built 1968
YOUNGFIELD STREET over CLEAR CREEK
Built 1988
I 70 ML EBND over CLEAR CREEK
Built 1968
I 70 ML WBND over CLEAR CREEK
Built 1968
SH 58 RAMP over I70ML/ SH58 ML/CLR CRK
Built 2008
I70 ML over 40TH AVE.
Built 2009
I 70 ML EBND over SH 391 ML
Built 1967
Bridge Details
- Structure #
- E-16-CW
- Year Built
- 1967
- Length
- 69 m (226.4 ft)
- Max Span
- 33.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,951
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $498,000
- Total Project Cost
- $758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.