SH 72 ML over FARMERS HIGHLINE CANAL
INDIANA ST ABOUT 7800 N · County 059, Colorado · Built 1954 · 2 Lanes · 16,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.837358, -105.165072
This bridge is in worse condition than 78.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 72 years old.
Nearby Bridges
SH 72 ML over CROKE CANAL
Built 1991
72ND AVENUE over FARMERS HIGHLINE CANAL
Built 1995
ALKIRE STREET over CROKE CANAL
Built 1992
ALKIRE STREET over FARMERS HIGHLINE CANAL
Built 1959
ELDRIDGE STREET over RALSTON CREEK | RALSTON
Built 1985
JOYCE STREET over RALSTON CREEK | RALSTON
Built 1975
SH 72 ML over RALSTON CREEK
Built 1985
70TH AVENUE over FARMERS HIGHLINE CANAL |
Built 1993
INDIANA STREET over UPPER BIG DRY CREEK | UP
Built 2008
BEECH STREET over RALSTON CREEK
Built 1978
Bridge Details
- Structure #
- E-16-BE
- Year Built
- 1954
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 16,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.