SH 72 ML over COAL CREEK

3.4 MI W OF JCT SH 93 · County 059, Colorado · Built 2020 · 2 Lanes · 5,100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
E-15-AR
Year Built
2020
Length
13 m (42.7 ft)
Max Span
6.3 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
5,100
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$336,000
Total Project Cost
$420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.