SH 119 ML over MIDDLE BOULDER CREEK

IN NEDERLAND · County 013, Colorado · Built 1933 · 2 Lanes · 5,800 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
E-14-AR
Year Built
1933
Reconstructed
1987
Length
9.4 m (30.8 ft)
Max Span
4.5 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
5,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.