CO ROAD 404 | PALM over WEST CHERRY CREEK

0.5 MI W OF HIGHWAY 83 · County 035, Colorado · Built 1995 · 2 Lanes · 2,643 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
DOU404-06.80-A
Year Built
1995
Length
13.8 m (45.3 ft)
Max Span
12.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
2,643
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.