CO ROAD 105 | S PE over OAKLAND SCHOOL GULCH
0.1 MI S WOLFENSBERGER RD · County 035, Colorado · Built 1990 · 2 Lanes · 4,343 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.369769, -104.956314
This bridge is in worse condition than 64.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 36 years old.
Nearby Bridges
PINE CLIFF AVENUE over WEST PLUM CREEK
Built 1965
JACKSON CREEK ROAD over WEST PLUM CREEK
Built 1951
SH 105 ML over DRAW
Built 1938
MEADOWS BLVD over EAST PLUM CREEK TRIBUTAR
Built 1987
BUENA VISTA COURT over LOCAL DRAINAGE
Built 1989
SH 67 ML over WEST PLUM CREEK
Built 1966
MEADOWS BLVD over EAST PLUM CREEK TRIBUTAR
Built 1987
SH 67 ML over EAST PLUM CREEK
Built 1963
N MEADOWS DRIVE over RAILROAD TRACK
Built 2015
SABERCAT WAY over EAST PLUM CREEK TRIBUTAR
Built 2007
Bridge Details
- Structure #
- DOU105-23.50A
- Year Built
- 1990
- Length
- 31.5 m (103.3 ft)
- Max Span
- 29.7 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,343
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.