NB PENA BOULEVARD over THIRD CREEK | 75TH AVENU

3.5 MI EAST OF E-470 · County 031, Colorado · Built 1992 · 3 Lanes · 55,210 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
D-31-PB-630
Year Built
1992
Length
6.4 m (21 ft)
Max Span
3 m
Width
53.1 m (174.2 ft)
Lanes
3
Daily Traffic
55,210
Material
Concrete
Design
Culvert
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.