US 34 ML over REPUBLICAN RIVER

IN WRAY · County 125, Colorado · Built 2021 · 2 Lanes · 3,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
D-28-V
Year Built
2021
Length
38.8 m (127.3 ft)
Max Span
18.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
3,600
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.