N TELLURIDE WAY over BLUE GRAMA CHANNEL

NW of TELLURIDE WAY-63RD · County 031, Colorado · Built 2020 · 4 Lanes · 4,047 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
D-25-FC-063
Year Built
2020
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Width
42.1 m (138.1 ft)
Lanes
4
Daily Traffic
4,047
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.