SH 157 ML over BNSF RR

IN BOULDER · County 013, Colorado · Built 1988 · 5 Lanes · 34,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D-16-DG
Year Built
1988
Length
103.5 m (339.6 ft)
Max Span
36.9 m
Width
29.4 m (96.5 ft)
Lanes
5
Daily Traffic
34,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.