SH 93 ML over BOULDER CREEK

N. of Arapahoe Ave · County 013, Colorado · Built 2004 · 4 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D-15-BC
Year Built
2004
Length
62.8 m (206 ft)
Max Span
40.2 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
22,000
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.