HIGH ST over EAST HARVARD GULCH

1 BLK N of VASSAR · County 031, Colorado · Built 1967 · 2 Lanes · 222 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
D-13-HGE-150
Year Built
1967
Length
9.7 m (31.8 ft)
Max Span
8.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
222
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.