SH 64 ML over STRAWBERRY CREEK
3.5 MILES WEST OF SH 13 J · County 103, Colorado · Built 2022 · 2 Lanes · 690 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.034983, -108.016578
This bridge is in worse condition than 28.6% of bridges in County 103. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
Bridge Details
- Structure #
- D-04-GA
- Year Built
- 2022
- Length
- 24.2 m (79.4 ft)
- Max Span
- 22.6 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 690
- Material
- Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,081,000
- Total Project Cost
- $2,601,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.