ORO BLANCO DR over TEMPLETON GAP FLOODWAY

0.15 MI N OF BARNES RD · County 041, Colorado · Built 1980 · 3 Lanes · 6,262 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
CSG-K.98-13.15
Year Built
1980
Length
6.1 m (20 ft)
Max Span
2.9 m
Width
28.5 m (93.5 ft)
Lanes
3
Daily Traffic
6,262
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.