RAMP TO UNION over TEMPLETON GAP FLOODWAY

AUSTIN BLUFFS PKWY/UNION · County 041, Colorado · Built 2009 · 3 Lanes · 6,359 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
CSG-I.48-12.32
Year Built
2009
Length
59.5 m (195.2 ft)
Max Span
29 m
Width
12.8 m (42 ft)
Lanes
3
Daily Traffic
6,359
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.