DUBLIN BLVD WB over LOCAL DRAINAGE

INTERSEC. W/WICKLOW CIR · County 041, Colorado · Built 1981 · 2 Lanes · 5,554 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
CSG-H.52-14.99
Year Built
1981
Length
6.3 m (20.7 ft)
Max Span
3.3 m
Width
37.5 m (123 ft)
Lanes
2
Daily Traffic
5,554
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$98,000
Total Project Cost
$540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.