PIKES PEAK AVENUE over SHOOKS RUN

NEAR EL PASO STREET · County 041, Colorado · Built 2003 · 4 Lanes · 15,976 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CSG-H.15-08.69A
Year Built
2003
Length
32 m (105 ft)
Max Span
30.5 m
Width
25.3 m (83 ft)
Lanes
4
Daily Traffic
15,976
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.