GARDEN OF GODS RD over MONUMENT CREEK
0.1 MI W OF NEVADA · County 041, Colorado · Built 1985 · 6 Lanes · 44,579 vehicles/day
Overall
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.897161, -104.820208
This bridge is in worse condition than 82.6% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 41 years old.
Nearby Bridges
NEVADA AVE over PEDESTRIAN UNDERPASS
Built 2009
I 25 ML over GARDEN OF THE GODS ROAD
Built 1988
NEVADA AVENUE over TEMPLETON GAP FLOODWAY
Built 1949
MARK DABLING BLVD over SOUTH DOUGLAS CREEK
Built 1984
MARK DABLING BLVD over DOUGLAS CREEK
Built 1984
SINTON ROAD over S.DOUGLAS CREEK
Built 1989
CHESTNUT STREET over NORTH DOUGLAS CREEK
Built 1973
I25 NBND OFF RAMP over MARK DABLING/UPRR
Built 2008
I25 ML NBND over MARK DABLING/UPRR
Built 2008
I25 ML SBND over MARK DABLING/UPRR
Built 2008
Bridge Details
- Structure #
- CSG-G.57-13.05A
- Year Built
- 1985
- Length
- 38.1 m (125 ft)
- Max Span
- 17.7 m
- Width
- 29.9 m (98.1 ft)
- Lanes
- 6
- Daily Traffic
- 44,579
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.