FULLENWIDER ST. over FARMERS UNION CANAL

JUST N OF WASHINGTON ST · County 109, Colorado · Built 1976 · 2 Lanes · 2,193 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
CENTER-1
Year Built
1976
Length
15.3 m (50.2 ft)
Max Span
14.6 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
2,193
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.