I 76 ML EBND over SH 144 ML

3.2 MI NE OF JCT US 34-B · County 087, Colorado · Built 1959 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C-21-E
Year Built
1959
Length
57 m (187 ft)
Max Span
22.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
8,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$229,000
Total Project Cost
$344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.