US 85 ML SBND over GREELEY CANAL NO 2

AT LUCERNE · County 123, Colorado · Built 1964 · 3 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C-18-CA
Year Built
1964
Length
9.6 m (31.5 ft)
Max Span
8.6 m
Width
14 m (45.9 ft)
Lanes
3
Daily Traffic
6,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$53,000
Total Project Cost
$80,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.