US 85 ML SBND over GREELEY CANAL NO 2
AT LUCERNE · County 123, Colorado · Built 1964 · 3 Lanes · 6,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.480025, -104.699725
This bridge is in worse condition than 42.1% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 62 years old.
Nearby Bridges
US 85 ML NBND over GREELEY CANAL NO 2
Built 2017
SH 392 ML over GREELEY CANAL NO 2
Built 1965
County Road 39 over New Cache La Poudre Cana
Built 1990
County Road 37 over New Cache La Poudre Cana
Built 1986
County Road 41 over New Cache La Poudre Cana
Built 1993
SH 392 ML over GREELEY CANAL NO 2
Built 1969
SH 392 ML over GREELEY CANAL NO 2
Built 1955
COUNTY ROAD 66 over EATON DRAW
Built 2023
County Road 35 over New Cache La Poudre Cana
Built 2005
SH 392 ML over GREELEY CANAL NO 2
Built 1969
Bridge Details
- Structure #
- C-18-CA
- Year Built
- 1964
- Length
- 9.6 m (31.5 ft)
- Max Span
- 8.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 3
- Daily Traffic
- 6,000
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $53,000
- Total Project Cost
- $80,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.