US 85 ML NBND over CACHE LA POUDRE RIVER

N. EDGE OF GREELEY · County 123, Colorado · Built 1962 · 2 Lanes · 11,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
C-18-BO
Year Built
1962
Length
76.8 m (252 ft)
Max Span
15.2 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
11,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$599,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.