US 34 ML EBND over RAMP TO US85 SB 8TH AVE

AT JCT US85 · County 123, Colorado · Built 1968 · 2 Lanes · 15,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
C-18-AV
Year Built
1968
Length
68.6 m (225.1 ft)
Max Span
28 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
15,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$800,000
Total Project Cost
$1,200,000