I25 ML over GW RR

0.6 MI SO of JCT SH 60 · County 123, Colorado · Built 2023 · 3 Lanes · 41,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
C-17-FV
Year Built
2023
Length
25.2 m (82.7 ft)
Max Span
24.3 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
41,000
Material
Other
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.