I25 ML over GW RR
0.6 MI SO of JCT SH 60 · County 123, Colorado · Built 2023 · 3 Lanes · 41,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.328094, -104.979956
This bridge is in worse condition than 15.5% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I 25 ML over GW RR
Built 2023
I 25 ML NBND over COUNTY ROAD 46
Built 2023
I 25 ML SBND over WELD COUNTY ROAD 46
Built 2022
SH 60 WB ML over I25 ML
Built 2022
SH 60 EB ML over I-25 ML
Built 2020
I 25 ML NBND over SH 60 ML
Built 2023
I 25 ML SBND over SH 60 ML
Built 2022
I25 ML NBND over SH56 ML
Built 2022
I25 ML SBND over SH56 ML
Built 2022
County Road 44 over Little Thompson River
Built 2018
Bridge Details
- Structure #
- C-17-FV
- Year Built
- 2023
- Length
- 25.2 m (82.7 ft)
- Max Span
- 24.3 m
- Width
- 20 m (65.6 ft)
- Lanes
- 3
- Daily Traffic
- 41,000
- Material
- Other
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.