US 34 BUSINESS over SHEEP DRAW
4.7 MI E OF SH 257 · County 123, Colorado · Built 1999 · 6 Lanes · 21,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.42135, -104.784797
This bridge is in worse condition than 42.1% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 27 years old.
Nearby Bridges
4th St (Cr 60.5) over Sheep Draw
Built 1992
71st Avenue over Sheep Draw Creek
Built 2018
59th Ave. over Greeley #3 Ditch
Built 2013
County Road 29 over Cache La Poudre River
Built 1990
83rd Ave. (CR 27) over Sheep Draw
Built 2004
County Rd 62 over Greeley No. 3 Ditch
Built 2012
59th Avenue over Cache La Poudre River
Built 1997
US 34 ML over LOVELAND-GREELEY CANAL
Built 1967
83rd Avenue over Cache La Poudre River
Built 1981
US 34 ML over LOVELAND-GREELEY CANAL
Built 1967
Bridge Details
- Structure #
- C-17-AZ
- Year Built
- 1999
- Length
- 34.4 m (112.9 ft)
- Max Span
- 33.8 m
- Width
- 27.2 m (89.2 ft)
- Lanes
- 6
- Daily Traffic
- 21,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.