US 287 ML over DRY CREEK

7.2 MI N OF JCT SH 66 · County 069, Colorado · Built 2005 · 4 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C-16-BC
Year Built
2005
Length
50 m (164 ft)
Max Span
24.7 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
18,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.