US 34 ML over DRAW

3.8 MI W OF LOVELAND · County 069, Colorado · Built 1933 · 2 Lanes · 4,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
C-16-AI
Year Built
1933
Length
10.5 m (34.4 ft)
Max Span
9.8 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
4,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$161,000
Total Project Cost
$177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.