SH 125 ML over WILLOW CREEK
14.3 MILES NORTH OF US 40 · County 049, Colorado · Built 1952 · 2 Lanes · 900 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
40.278008, -106.086217
This bridge is in worse condition than 85.2% of bridges in County 049. The average bridge in Colorado is 0 years old; this one is 74 years old.
Bridge Details
- Structure #
- C-12-A
- Year Built
- 1952
- Length
- 13.6 m (44.6 ft)
- Max Span
- 4.3 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 900
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.