COUNTY ROAD 34 over FT. LYON CANAL
1 MI N OF CR W · County 011, Colorado · Built 1950 · 2 Lanes · 46 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.257233, -102.779269
This bridge is in worse condition than 63.8% of bridges in County 011. The average bridge in Colorado is 0 years old; this one is 76 years old.
Nearby Bridges
COUNTY ROAD A over SANTANTA CANAL
Built 1991
COUNTY ROAD 35 over KICKING BIRD CANAL
Built 1984
COUNTY ROAD 35 over FT. LYON CANAL
Built 1984
COUNTY ROAD 39.5 over KICKING BIRD CANAL
Built 1993
COUNTY ROAD UU.5 over FT. LYON CANAL
Built 1998
COUNTY ROAD C over KICKING BIRD CANAL
Built 1991
COUNTY ROAD C over SANTANTA CANAL
Built 1991
COUNTY ROAD 36 over FT. LYON CANAL
Built 1991
US 287 ML over SANTANA CANAL
Built 1978
US 287 ML over FORT LYON CANAL
Built 1978
Bridge Details
- Structure #
- BT34-35-42.5-35
- Year Built
- 1950
- Length
- 12.3 m (40.4 ft)
- Max Span
- 11.8 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 46
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $810,000
- Total Project Cost
- $891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.