Pearl Parkway over S. Goose Creek Drainage

At 49th Street · County 013, Colorado · Built 1986 · 4 Lanes · 10,375 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
BOLD-18-1.83-01
Year Built
1986
Length
22.9 m (75.1 ft)
Max Span
8.5 m
Width
38.6 m (126.6 ft)
Lanes
4
Daily Traffic
10,375
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.