30th Street over North Goose Creek

At Mapleton & 30th St · County 013, Colorado · Built 1994 · 4 Lanes · 21,233 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
BOLD-07-1.72-04
Year Built
1994
Length
18.2 m (59.7 ft)
Max Span
8.5 m
Width
37.9 m (124.3 ft)
Lanes
4
Daily Traffic
21,233
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.