N 115th St over Highland Ditch

0.95 Mi N of Vermillion R · County 013, Colorado · Built 2012 · 2 Lanes · 435 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
BC-3-2.3-IDA
Year Built
2012
Length
7 m (23 ft)
Max Span
7 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
435
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.