N 115th St over Highland Ditch
0.95 Mi N of Vermillion R · County 013, Colorado · Built 2012 · 2 Lanes · 435 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
40.231256, -105.08355
This bridge is in worse condition than 38.6% of bridges in County 013. The average bridge in Colorado is 0 years old; this one is 14 years old.
Nearby Bridges
US 287 ML over HIGHLAND DITCH
Built 1999
County Road 1 over New Ish Ditch
Built 1980
Olympia Avenue over Spring Gulch
Built 2000
Pace Street over Spring Gulch
Built 2000
N. 95th St (CR10) over Highland Ditch
Built 1989
17th Avenue over Spring Gulch
Built 2000
21st Ave Eastbound over Oligarchy Ditch
Built 1975
Country View Court over New Ish Ditch
Built 2016
15th Avenue over Oligarchy Ditch
Built 1989
County Road 34 over Supply Ditch
Built 1937
Bridge Details
- Structure #
- BC-3-2.3-IDA
- Year Built
- 2012
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 435
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.