COUNTY ROAD J over NORTH UTE CANYON
1.6 MI W OF SH 287/385 · County 009, Colorado · Built 1935 · 2 Lanes · 46 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
37.105222, -102.609586
This bridge is in worse condition than 29.5% of bridges in County 009. The average bridge in Colorado is 0 years old; this one is 91 years old.
Nearby Bridges
US 287 ML over DRAW
Built 1971
COUNTY ROAD 28 over TRIB N.FORK CIMARRON RVR
Built 1935
COUNTY ROAD 24 over UTE CANYON
Built 1978
COUNTY ROAD 28 over TRIB N.FORK CIMARRON RVR
Built 1938
COUNTY ROAD 18 over UNNAMED CREEK
Built 1960
COUNTY ROAD 23 over SAND ARROYO
Built 1935
US 287 ML over SAND ARROYO
Built 1997
U.S. 287 over CREEK
Built 1935
Bridge Details
- Structure #
- BAH-26.3-7-77
- Year Built
- 1935
- Reconstructed
- 1965
- Length
- 21.4 m (70.2 ft)
- Max Span
- 6.3 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 46
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.